Menu
Log in

[Bike] Bike Director Inauguration

  • Sat, November 01, 2025
  • 8:30 AM - 12:00 PM
  • Golden Gate Bridge Welcome Center

Registration


Register

Official Bike Director Inauguration

~ What to expect ~

Please join me, Jaimie, as I officially induct Soledad into the line of Bike Directors. We will ride easy to Mill Valley, climb four corners, descend to Muir woods (turn left at four corners), then regroup at Stinson beach where there is water and bathrooms. Then we'll head to the Bofax climb, turn towards Alpine Dam and descend to Fairfax where we'll stop to get pastries/coffee. The descent from Alpine Dam -> Fairfax has some rough roads so be careful! Coming back into town from Fairfax will be social. The ride is a drop ride but we will regroup in a few spots! Regroups will be relatively short, except for Fairfax where we'll probably sit down and spend some time. Feel free to join for part or all of the ride!

~ Details ~

  • Where/When: GGB @ 8:30AM or Mikes Bikes @ 9:00AM
  • Distance: 58 mi
  • Elevation gained: 5,000 ft
  • Drop factor: Drop (wondering what this means?), but not forgotten
  • Avg. flat ground speed: 15-17 mph
  • Route: https://www.strava.com/routes/3418285325865707352
  • Regroup at: Stinson, top of bofax, Fairfax for coffee

Please download the route on to your bike computer ahead of time (instructions here)! If you don't have a bike computer, download it on your phone since there may be areas with no signal. 

Reach out to Soledad at bike@ggtc.org or Jaimie at president@ggtc.org for questions!

Golden Gate Triathlon Club is a 501(c)7 non-profit organization.

Powered by Wild Apricot Membership Software